Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 10/17/2024 Payment 0.00 0.00 0.00 0.00 0.00 0.00 155,114.10 155,114.10
2 11/14/2024 Audit 0.00 0.00 0.00 0.00 0.00 0.00 3,911.90 3,911.90
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 159,026.00 159,026.00