Bill #
Payment Date
Type
Predesign
Spec. Study
DE Engr.
Right of Way
CN Engr.
CN Other
CN Contract
Total
1
12/02/2024
Audit
0.00
0.00
0.00
0.00
0.00
0.00
12,974.00
12,974.00
TOTAL PAYMENTS
0.00
0.00
0.00
0.00
0.00
0.00
12,974.00
12,974.00