Complete gaps in existing sidewalk system on Pioneer Way (SR 162) and 3rd Street.Repair existing sidwalks to ADA standards (broken sidewalks and raised panels) in various locations.
Projects — TIB Project Information
TIB Project Information
Town of South Prairie's Sidewalk Project 2026
P-P-815(P03)-1
P-P-815(P03)-1
Sidewalk Project 2026
Various Locations
FY 2027 Active Transportation Program
Current Phase : Construction
Total TIB Funding : $111,433
County: Pierce | Legislative District: 31 | Project Length: 605.00 | TIB Engineer: Greg Armstrong | Last Payment Date: 04/13/2026
Project Information
| Lead Agency | SOUTH PRAIRIE |
| Funding Year | 2027 |
| Program | ATP |
| Current Phase | Construction |
| Legislative District | 31 |
| Congressional District | 8 |
| Federal Route Number | 0162 |
| Project Length | 605.00 mi. |
| ADT | 9,800 |
| Functional Class | Collector |
| Type of Work | Pedestrian |
| Project Contact | Terri Berry |
| Contact Email | clerk@townofsp.com |
| TIB Engineer | Greg Armstrong |
| Last Payment Date | 04/13/2026 |
| Cultural Resource Assessment | CRA |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 11/21/2025 | |
| Delayed Project Date | 07/01/2028 | |
| DAHP Assessment Date | 02/04/2026 | |
| Predesign Approval | ||
| Design Approval | 01/12/2026 | 11/26/2025 |
| Bid Auth. Approval | 04/14/2026 | 03/03/2026 |
| Construction Approval | 03/31/2026 | 04/16/2026 |
| Project Closeout | 10/30/2026 | |
| Audit Date | ||
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 23,820 | 23,800 |
| Right of Way | 0 | 0 |
| Total Design | 23,820 | 23,800 |
| Construction Engineering | 15,880 | 22,000 |
| Construction Contract | 158,800 | 65,633 |
| Other Construction | 0 | 0 |
| Total Construction | 174,680 | 87,633 |
| Funding Surplus | - 87,067 | |
| Total TIB Funding | 111,433 | 111,433 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| SOUTH PRAIRIE | 0 | 0.0% |
| WSDOT Funding | 0 | 0.0% |
| Total Local Funding | 0 | 0.0% |
Project Description
Install new sidewalks in two areas to complete gaps in system (480 LF). 1 gap on the south side of Pioneer Way and 1 gap on the north side of 3rd StreetRemove panels and replace where existing sidewalks are broken and grind existing sidewalk joints where raised.
Existing Condition
Project Benefits
- Improves pedestrian safety;
- Extends improvements;
- Removes ADA barriers
Project Pictures
No images available.
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||