1) Existing pedestrian crosswalk Pioneer and Roosevelt Ave the existing crosswalk at Pioneer St directs pedestrians to cross into a commercial driveway2) King County Metro Route 915 stops four Route 915 stops are currently not ADA compliant, require users to board / dismount into planter strips3) ADA Ramp Upgrades There are 22 existing non-complaint ADA ramps from Semanski to Cole Steet. Eight ADA ramps are identified as high priority ramps in the Citys ADA Transition Plan 2024 Update
Projects — TIB Project Information
TIB Project Information
City of Enumclaw's Roosevelt Avenue ADA Ramp Upgrades
P-P-124(P04)-1
P-P-124(P04)-1
Roosevelt Avenue ADA Ramp Upgrades
Semanski St to Cole St
FY 2027 Active Transportation Program
Current Phase : Construction
Total TIB Funding : $181,037
County: King | Legislative District: 5 | Project Length: 2,000.00 | TIB Engineer: Greg Armstrong | Last Payment Date:
Project Information
| Lead Agency | ENUMCLAW |
| Funding Year | 2027 |
| Program | ATP |
| Current Phase | Construction |
| Legislative District | 5 |
| Congressional District | 8 |
| Federal Route Number | 8000 |
| Project Length | 2000.00 mi. |
| ADT | 5,000 |
| Functional Class | Minor |
| Type of Work | Pedestrian |
| Project Contact | Zachary Jones |
| Contact Email | zjones@ci.enumclaw.wa.us |
| TIB Engineer | Greg Armstrong |
| Last Payment Date | |
| Cultural Resource Assessment | CRA |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 11/21/2025 | |
| Delayed Project Date | 01/01/2027 | |
| DAHP Assessment Date | 12/18/2025 | |
| Predesign Approval | ||
| Design Approval | 01/01/2026 | 12/15/2025 |
| Bid Auth. Approval | 02/12/2026 | 02/11/2026 |
| Construction Approval | 03/10/2026 | 03/11/2026 |
| Project Closeout | 08/01/2026 | |
| Audit Date | ||
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 0 | 0 |
| Right of Way | 0 | 0 |
| Total Design | 0 | 0 |
| Construction Engineering | 24,000 | 7,787 |
| Construction Contract | 257,263 | 191,510 |
| Other Construction | 0 | 27,000 |
| Total Construction | 281,263 | 226,297 |
| Funding Surplus | - 100,226 | |
| Total TIB Funding | 181,037 | 226,297 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| ENUMCLAW | 45,260 | 20.0% |
| WSDOT Funding | 0 | 0.0% |
| Total Local Funding | 45,260 | 20.0% |
Project Description
1) Designate crosswalk at appropriate intersection with bulb-outs, RRFB signals2) Installation of proper boarding and alighting areas at existing transit stop locations following WSDOT Design Manual Chapter 1730 guidelines and ADA standards3) Upgrade existing ADA ramps to current City and ADA standards
Existing Condition
Project Benefits
- Improves pedestrian safety;
- Removes ADA barriers
Project Pictures
No images available.
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||