City of Kettle Falls's 6th Ave Sidewalk

P-E-903(P07)-1

P-E-903(P07)-1
6th Ave Sidewalk

Kettle Falls Library to Narcissus St

FY 2027 Active Transportation Program
Current Phase : Bid Authorization
Total TIB Funding : $100,120

County: Stevens   |   Legislative District: 7   |   Project Length: 250.00   |   TIB Engineer: Andrew Beagle   |   Last Payment Date:

Project Information

Lead Agency KETTLE FALLS
Funding Year 2027
Program ATP
Current Phase Bid Authorization
Legislative District 7
Congressional District 5
Federal Route Number 9999
Project Length 250.00 mi.
ADT 0
Functional Class TIB Arterial
Type of Work Pedestrian
Project Contact Dave Wiley
Contact Email dwilley@kettle-falls.com
TIB Engineer Andrew Beagle
Last Payment Date
Cultural Resource Assessment CRA

Project Schedule

  Target Date Actual Date
Project Selection Date   11/21/2025
Delayed Project Date 07/01/2028  
DAHP Assessment Date   02/13/2026
Predesign Approval
Design Approval 02/01/2026 01/23/2026
Bid Auth. Approval 04/01/2026 03/19/2026
Construction Approval 05/01/2026
Project Closeout 09/30/2026
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 9,975 10,500
Right of Way 0 0
Total Design 9,975 10,500
     
Construction Engineering 9,975 10,500
Construction Contract 80,170 84,390
Other Construction 0 0
Total Construction 90,145 94,890
     
Total TIB Funding 100,120 105,390

Local Funding Partners

Funding Amount Percent
KETTLE FALLS 5,270 5.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 5,270 5.0%

Project Description

Construction of approximately 250 feet of infill or replaced sidewalk, driveway approaches and ADA curb ramps.

Project Pictures

No images available.

Project Delays

Delay Type Resolution Date Comments

No delayed project history.