There is currently missing sidewalk along 6th Ave to the South from the Kettle Falls Library east to Narcissus Street and Senior's Center. Sidewalk either doesn't exist or is too narrow and breaking down. Existing curb ramp at the southwest corner of 6th Ave and Narcissus Street does not comply with ADA Standards.
Projects — TIB Project Information
TIB Project Information
City of Kettle Falls's 6th Ave Sidewalk
P-E-903(P07)-1
P-E-903(P07)-1
6th Ave Sidewalk
Kettle Falls Library to Narcissus St
FY 2027 Active Transportation Program
Current Phase : Bid Authorization
Total TIB Funding : $100,120
County: Stevens | Legislative District: 7 | Project Length: 250.00 | TIB Engineer: Andrew Beagle | Last Payment Date:
Project Information
| Lead Agency | KETTLE FALLS |
| Funding Year | 2027 |
| Program | ATP |
| Current Phase | Bid Authorization |
| Legislative District | 7 |
| Congressional District | 5 |
| Federal Route Number | 9999 |
| Project Length | 250.00 mi. |
| ADT | 0 |
| Functional Class | TIB Arterial |
| Type of Work | Pedestrian |
| Project Contact | Dave Wiley |
| Contact Email | dwilley@kettle-falls.com |
| TIB Engineer | Andrew Beagle |
| Last Payment Date | |
| Cultural Resource Assessment | CRA |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 11/21/2025 | |
| Delayed Project Date | 07/01/2028 | |
| DAHP Assessment Date | 02/13/2026 | |
| Predesign Approval | ||
| Design Approval | 02/01/2026 | 01/23/2026 |
| Bid Auth. Approval | 04/01/2026 | 03/19/2026 |
| Construction Approval | 05/01/2026 | |
| Project Closeout | 09/30/2026 | |
| Audit Date | ||
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 9,975 | 10,500 |
| Right of Way | 0 | 0 |
| Total Design | 9,975 | 10,500 |
| Construction Engineering | 9,975 | 10,500 |
| Construction Contract | 80,170 | 84,390 |
| Other Construction | 0 | 0 |
| Total Construction | 90,145 | 94,890 |
| Total TIB Funding | 100,120 | 105,390 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| KETTLE FALLS | 5,270 | 5.0% |
| WSDOT Funding | 0 | 0.0% |
| Total Local Funding | 5,270 | 5.0% |
Project Description
Construction of approximately 250 feet of infill or replaced sidewalk, driveway approaches and ADA curb ramps.
Existing Condition
Project Benefits
- Pedestrian safety, mobiliity and accessibility.
Project Pictures
No images available.
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||