This project will enhance pedestrian and bicyclist safety measures at the uncontrolled intersection of NE 3rd Ave. between NE Adams St. and NE Cedar St. in downtown Camas.
Projects — TIB Project Information
TIB Project Information
City of Camas's NE Third Ave Pedestrian and Bicycle Improvements
C-W-185(001)-1
C-W-185(001)-1
NE Third Ave Pedestrian and Bicycle Improvements
NE Adams Street to NE Cedar Street
FY 2026 Complete Streets Program
Current Phase : Construction
Total TIB Funding : $264,161
County: Clark | Legislative District: 17 | Project Length: 0.00 | TIB Engineer: Chris Langhoff | Last Payment Date: 04/29/2026
Project Information
| Lead Agency | CAMAS |
| Funding Year | 2026 |
| Program | CSP |
| Current Phase | Construction |
| Legislative District | 17 |
| Congressional District | 3 |
| Federal Route Number | 7026 |
| Project Length | 0.00 mi. |
| ADT | 0 |
| Functional Class | Principal |
| Type of Work | Pedestrian |
| Project Contact | Allen Westersund |
| Contact Email | awestersund@cityofcamas.us |
| TIB Engineer | Chris Langhoff |
| Last Payment Date | 04/29/2026 |
| Cultural Resource Assessment | CRA |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 11/22/2024 | |
| Delayed Project Date | 07/01/2027 | |
| DAHP Assessment Date | 02/11/2025 | |
| Predesign Approval | ||
| Design Approval | 12/30/2024 | 12/12/2024 |
| Bid Auth. Approval | 06/13/2025 | 06/13/2025 |
| Construction Approval | 07/11/2025 | 07/18/2025 |
| Project Closeout | 12/31/2025 | |
| Audit Date | ||
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 47,571 | 24,708 |
| Right of Way | 0 | 0 |
| Total Design | 47,571 | 24,708 |
| Construction Engineering | 23,785 | 26,785 |
| Construction Contract | 285,422 | 283,709 |
| Other Construction | 0 | 0 |
| Total Construction | 309,207 | 310,494 |
| Funding Surplus | - 92,617 | |
| Total TIB Funding | 264,161 | 335,202 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| CAMAS | 71,041 | 21.2% |
| WSDOT Funding | 0 | 0.0% |
| Total Local Funding | 71,041 | 21.2% |
Project Description
This project will install two Rectangular Rapid Flashing Beacons, four crosswalk lights, traffic calming islands and bike lanes extending one block east and one block west of the intersection.
Existing Condition
Project Benefits
- NE 3rd Ave. is the primary route through downtown Camas for motorists traveling to and from State Route 14. It is also the primary connection between Camas and the City of Washougal. Average Daily Traffic at the intersection of NE 3rd Ave. and NE Birch St. is over 8,000 vehicles, many of which fail to stop for pedestrians that are waiting to cross NE 3rd Ave.
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||