As a part of the Citys Non-Motorized Plan, a 2.4 mile sidewalk connection between Steilacoom Boulevard. and Washington Boulevard. is to be constructed along Hipkins Rd., 104th St., Idlewild Rd., 112th St., and Interlaaken Drive, Existing sidewalk within the corridor accounts for 0.7 miles. The City is currently constructing sidewalk along Hipkins Rd., extending it an additional 1.0 miles. The project described in this application would extend sidewalk an additional 0.2 miles. The City is planning a project to construct the final 0.7 miles of sidewalk in 2025 along Interlaaken Dr. between 112th St. and Washington Blvd. This will connect Idlewild Elementary to numerous residences throughout the area.
Projects — TIB Project Information
TIB Project Information
City of Lakewood's 112th Street and Idlewild Road Sidewalk
C-P-199(003)-1
C-P-199(003)-1
112th Street and Idlewild Road Sidewalk
Interlaaken Drive to Idlewild Elementary
FY 2026 Complete Streets Program
Current Phase : Construction
Total TIB Funding : $568,808
County: Pierce | Legislative District: 28 | Project Length: 0.00 | TIB Engineer: Greg Armstrong | Last Payment Date: 04/04/2026
Project Information
| Lead Agency | LAKEWOOD |
| Funding Year | 2026 |
| Program | CSP |
| Current Phase | Construction |
| Legislative District | 28 |
| Congressional District | 10 |
| Federal Route Number | 9999 |
| Project Length | 0.00 mi. |
| ADT | 0 |
| Functional Class | Local Access |
| Type of Work | Pedestrian |
| Project Contact | Troy Pokswinski |
| Contact Email | tpokswinski@cityoflakewood.us |
| TIB Engineer | Greg Armstrong |
| Last Payment Date | 04/04/2026 |
| Cultural Resource Assessment | CRA |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 11/22/2024 | |
| Delayed Project Date | 01/01/2026 | |
| DAHP Assessment Date | 02/13/2025 | |
| Predesign Approval | ||
| Design Approval | 12/01/2024 | 12/03/2024 |
| Bid Auth. Approval | 04/10/2025 | 04/15/2025 |
| Construction Approval | 05/29/2025 | 06/02/2025 |
| Project Closeout | 05/15/2026 | |
| Audit Date | ||
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 0 | 0 |
| Right of Way | 0 | 0 |
| Total Design | 0 | 0 |
| Construction Engineering | 83,177 | 48,500 |
| Construction Contract | 643,823 | 687,705 |
| Other Construction | 0 | 0 |
| Total Construction | 727,000 | 736,205 |
| Funding Surplus | - 158,192 | |
| Total TIB Funding | 568,808 | 736,205 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| LAKEWOOD | 167,397 | 22.7% |
| WSDOT Funding | 0 | 0.0% |
| Total Local Funding | 167,397 | 22.7% |
Project Description
This project will complete the pedestrian facilities along 112th Street SW and Idlewild Road SW between Interlaaken Drive SW and Idlewild Elementary.
Existing Condition
Project Benefits
- The project will construct curb, gutter and 6 sidewalk. Street lighting on wood poles will be added to the west side of Idlewild Road SW.
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||