Transportation Improvement Board
Performance Management Dashboard

 Projects — TIB Project Information

TIB Project Information

City of Fircrest's Electron Way

C-P-130(001)-1

C-P-130(001)-1
Electron Way

Constra Costa Ave Intersection

FY 2026 Complete Streets Program
Current Phase : Audit
Total TIB Funding : $70,587

County: Pierce   |   Legislative District: 28   |   Project Length: 0.10   |   TIB Engineer: Greg Armstrong   |   Last Payment Date: 04/01/2025

Project Information

Lead Agency FIRCREST
Funding Year 2026
Program CSP
Current Phase Audit
Legislative District 28
Congressional District 10
Federal Route Number 9999
Project Length 0.10 mi.
ADT 0
Functional Class Collector
Type of Work Pedestrian
Project Contact Tyler Bemis
Contact Email tbemis@cityoffircrest.net
TIB Engineer Greg Armstrong
Last Payment Date 04/01/2025
Cultural Resource Assessment

Project Schedule

  Target Date Actual Date
Project Selection Date   05/13/2024
Delayed Project Date 05/13/2027  
DAHP Assessment Date  
Predesign Approval
Design Approval 06/15/2024 06/27/2024
Bid Auth. Approval 09/24/2024 09/25/2024
Construction Approval 10/15/2024 11/04/2024
Project Closeout 03/31/2025 03/27/2025
Audit Date   04/01/2025
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 6,000 25,844
Construction Contract 59,847 129,218
Other Construction 0 0
Total Construction 65,847 155,062
     
Funding Increase 9,877  
Funding Surplus - 5,137  
Total TIB Funding 70,587 155,062

Local Funding Partners

Funding Amount Percent
FIRCREST 4,722 3.0%
WSDOT Funding 0 0.0%
Department of Commerce  79,753 47.2%
 
 
 
 
 
 
 
Total Local Funding 84,475 50.2%

Project Description

The project will provide curb, gutter, and ADA-compliant ramps, and tie into existing facilities at the north approach crossing from Contra Costa Ave (E-W) and the west approach crossing of Electron Way (N-S). The project will replace very dated and out-of-compliance curb ramps to serve people of all ages and abilities with accessible crossing locations. These improvements provide a direct connection to non­motorized improvements funded by legislative capital appropriations to install new curb ramps serving the south approach crossing from Contra Costa Ave (E-W) and the east approach crossing of Electron Way (N-S), with an RRFB to improve pedestrian safety. The legislative funding only replaces half of the out-of-compliant curb ramps, which makes it difficult to tie into new facilities with existing facilities while meeting ADA standards.

Project Pictures

No images available.

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments