City of Connell's School zone and speed feedback signs

C-E-926(001)-1

C-E-926(001)-1
School zone and speed feedback signs

Cemetary Road to 5th Avenue

FY 2026 Complete Streets Program
Current Phase : Audit
Total TIB Funding : $53,200

County: Franklin   |   Legislative District: 13   |   Project Length: 0.49   |   TIB Engineer: Jonathan Heusman   |   Last Payment Date: 04/14/2025

Project Information

Lead Agency CONNELL
Funding Year 2026
Program CSP
Current Phase Audit
Legislative District 13
Congressional District 5
Federal Route Number C116
Project Length 0.49 mi.
ADT 0
Functional Class Collector
Type of Work Traffic Control
Project Contact Hallie Tuck
Contact Email htuck@connellwa.org
TIB Engineer Jonathan Heusman
Last Payment Date 04/14/2025
Cultural Resource Assessment Not Required

Project Schedule

  Target Date Actual Date
Project Selection Date   03/22/2024
Delayed Project Date 03/22/2027  
DAHP Assessment Date  
Predesign Approval
Design Approval 04/30/2024 06/11/2024
Bid Auth. Approval 06/30/2024 09/19/2024
Construction Approval 08/01/2024 09/20/2024
Project Closeout 04/30/2025 04/11/2025
Audit Date   04/14/2025
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 4,750 4,000
Right of Way 0 0
Total Design 4,750 4,000
     
Construction Engineering 4,750 2,000
Construction Contract 85,500 50,000
Other Construction 0 0
Total Construction 90,250 52,000
     
Funding Surplus - 41,800  
Total TIB Funding 53,200 56,000

Local Funding Partners

Funding Amount Percent
CONNELL 2,800 5.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 2,800 5.0%

Project Description

Remove and replace the existing signage with school zone flasher/speed feedback signs. This type of signage has proven very effective at controlling speeds in school zone areas. The signage will be added to the current TIB funded chip seal project to minimize design, bidding, and mobilization costs.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.