City of Castle Rock's Pleasant Hill Road Reconstruction

6-W-952(006)-1

6-W-952(006)-1
Pleasant Hill Road Reconstruction

Huntington Ave S to South City Limits

FY 2027 Small City Arterial Program
Current Phase : Bid Authorization
Total TIB Funding : $1,315,645

County: Cowlitz   |   Legislative District: 20   |   Project Length: 0.35   |   TIB Engineer: Chris Langhoff   |   Last Payment Date:

Project Information

Lead Agency CASTLE ROCK
Funding Year 2027
Program SCAP
Current Phase Bid Authorization
Legislative District 20
Congressional District 3
Federal Route Number 6845
Project Length 0.35 mi.
ADT 500
Functional Class Collector
Type of Work Reconstruction
Project Contact Tyler Stone
Contact Email crpwd@ci.castle-rock.wa.us
TIB Engineer Chris Langhoff
Last Payment Date
Cultural Resource Assessment Not Required

Project Schedule

  Target Date Actual Date
Project Selection Date   11/21/2025
Delayed Project Date 07/01/2028  
DAHP Assessment Date  
Predesign Approval
Design Approval 01/03/2026 12/18/2025
Bid Auth. Approval 03/19/2026 04/13/2026
Construction Approval 05/10/2026
Project Closeout 07/10/2026
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 151,810 159,800
Right of Way 0 0
Total Design 151,810 159,800
     
Construction Engineering 151,810 159,800
Construction Contract 1,012,025 1,065,300
Other Construction 0 0
Total Construction 1,163,835 1,225,100
     
Total TIB Funding 1,315,645 1,384,900

Local Funding Partners

Funding Amount Percent
CASTLE ROCK 69,255 5.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 69,255 5.0%

Project Description

Provide a 12 in. full depth pavement reclamation (FDR) incorporating 4% Portland cement into the existing road base to utilize the aggregate base. The FDR surface will then be shaped and compacted, and then overlaid with 2 in. of hot mixed asphalt. The drive lanes will be narrowed to provide a wider shoulder for bicyclists and pedestrians, and guardrail will be raised or replaced.

Project Pictures

No images available.

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments