The existing project segments are generally in fair condition, but are showing signs of deterioration. Most areas with cracks have been treated with crack sealing in a previous project.
Projects — TIB Project Information
TIB Project Information
City of Montesano's 2026 Chip Seal
2-W-957(020)-1
2-W-957(020)-1
2026 Chip Seal
Multiple Locations
FY 2027 Small City Preservation Program
Current Phase : Construction
Total TIB Funding : $288,468
County: Grays Harbor | Legislative District: 24 | Project Length: 2.85 | TIB Engineer: Chris Langhoff | Last Payment Date:
Project Information
| Lead Agency | MONTESANO |
| Funding Year | 2027 |
| Program | SCPP |
| Current Phase | Construction |
| Legislative District | 24 |
| Congressional District | 6 |
| Federal Route Number | 9999 |
| Project Length | 2.85 mi. |
| ADT | 0 |
| Functional Class | TIB Arterial |
| Type of Work | Resurfacing |
| Project Contact | MIke Olden PE |
| Contact Email | molden@montesano.us |
| TIB Engineer | Chris Langhoff |
| Last Payment Date | |
| Cultural Resource Assessment | Not Required |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 11/21/2025 | |
| Delayed Project Date | 07/01/2028 | |
| DAHP Assessment Date | ||
| Predesign Approval | ||
| Design Approval | 02/01/2026 | 01/27/2026 |
| Bid Auth. Approval | 04/28/2026 | 04/09/2026 |
| Construction Approval | 05/13/2026 | 04/24/2026 |
| Project Closeout | 10/30/2026 | |
| Audit Date | ||
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 0 | 0 |
| Right of Way | 0 | 0 |
| Total Design | 0 | 0 |
| Construction Engineering | 0 | 0 |
| Construction Contract | 333,000 | 321,040 |
| Other Construction | 0 | 0 |
| Total Construction | 333,000 | 321,040 |
| Funding Surplus | - 44,532 | |
| Total TIB Funding | 288,468 | 321,040 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| MONTESANO | 32,572 | 10.1% |
| WSDOT Funding | 0 | 0.0% |
| Total Local Funding | 32,572 | 10.1% |
Project Description
Chip seal
Existing Condition
Project Benefits
Project Pictures
No images available.
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||