Town wide maintenance is necessary to extend the lifespan of existing paved roadways. Cracks have formed in these roadways as a result of weathering and usage, necessitating essential maintenance.
Projects — TIB Project Information
TIB Project Information
Town of Index's 2025 Crack Seal
2-P-821(001)-1
2-P-821(001)-1
2025 Crack Seal
Multiple Locations
FY 2026 Small City Preservation Program
Current Phase : Withdrawn
Total TIB Funding : $0
County: Snohomish | Legislative District: 12 | Project Length: 0.00 | TIB Engineer: Greg Armstrong | Last Payment Date:
Project Information
| Lead Agency | INDEX |
| Funding Year | 2026 |
| Program | SCPP |
| Current Phase | Withdrawn |
| Legislative District | 12 |
| Congressional District | 8 |
| Federal Route Number | 9999 |
| Project Length | 0.00 mi. |
| ADT | 0 |
| Functional Class | Local Access |
| Type of Work | Resurfacing |
| Project Contact | Jenny Johnson |
| Contact Email | townhall@cityofindex.org |
| TIB Engineer | Greg Armstrong |
| Last Payment Date | |
| Cultural Resource Assessment | Not Required |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 11/22/2024 | |
| Delayed Project Date | 07/01/2027 | |
| DAHP Assessment Date | ||
| Predesign Approval | ||
| Design Approval | 01/01/2025 | 12/10/2024 |
| Bid Auth. Approval | 03/31/2026 | |
| Construction Approval | 04/15/2026 | |
| Project Closeout | 10/31/2026 | |
| Audit Date | ||
| Withdrawn Date | 04/06/2026 |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 0 | 0 |
| Right of Way | 0 | 0 |
| Total Design | 0 | 0 |
| Construction Engineering | 0 | 0 |
| Construction Contract | 0 | 0 |
| Other Construction | 0 | 0 |
| Total Construction | 0 | 0 |
| Total TIB Funding | 0 | 0 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| INDEX | 0 | 0.0% |
| WSDOT Funding | 0 | 0.0% |
| Total Local Funding | 0 | 0.0% |
Project Description
Proposed solution includes a town wide crack seal.
Existing Condition
Project Benefits
- Fills Cracks
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||