Roadway degradation throughout the town has been caused by cracking asphalt in the roadways. These cracks travel both laterally and longitudinally and repair action is necessary to extend the roadways service life before the degradation reaches the point where roadway resurfacing is necessary.
Projects — TIB Project Information
TIB Project Information
Town of Naches's 2026 Crack Seal
2-E-944(004)-1
2-E-944(004)-1
2026 Crack Seal
Multiple Locations
FY 2027 Small City Preservation Program
Current Phase : Construction
Total TIB Funding : $31,302
County: Yakima | Legislative District: 15 | Project Length: 0.00 | TIB Engineer: Jonathan Heusman | Last Payment Date:
Project Information
| Lead Agency | NACHES |
| Funding Year | 2027 |
| Program | SCPP |
| Current Phase | Construction |
| Legislative District | 15 |
| Congressional District | 4 |
| Federal Route Number | 9999 |
| Project Length | 0.00 mi. |
| ADT | 0 |
| Functional Class | TIB Arterial |
| Type of Work | |
| Project Contact | Treesa Morales |
| Contact Email | treesa.morales@nacheswa.us |
| TIB Engineer | Jonathan Heusman |
| Last Payment Date | |
| Cultural Resource Assessment | Not Required |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 11/21/2025 | |
| Delayed Project Date | 01/01/2027 | |
| DAHP Assessment Date | ||
| Predesign Approval | ||
| Design Approval | 01/12/2026 | 03/05/2026 |
| Bid Auth. Approval | 03/04/2026 | 03/19/2026 |
| Construction Approval | 04/11/2026 | 04/20/2026 |
| Project Closeout | 06/30/2026 | |
| Audit Date | ||
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 0 | 0 |
| Right of Way | 0 | 0 |
| Total Design | 0 | 0 |
| Construction Engineering | 0 | 5,000 |
| Construction Contract | 65,018 | 27,950 |
| Other Construction | 0 | 0 |
| Total Construction | 65,018 | 32,950 |
| Funding Surplus | - 33,716 | |
| Total TIB Funding | 31,302 | 32,950 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| NACHES | 1,648 | 5.0% |
| WSDOT Funding | 0 | 0.0% |
| Total Local Funding | 1,648 | 5.0% |
Project Description
City-wide crack seal using the clean-and-seal method.
Existing Condition
Project Benefits
- Prolong the life of the roadways by crack sealing. Will also prep the roads for a future city-wide chip seal project.
Project Pictures
No images available.
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||