By performing a fog seal preservation treatment, the otta sealed surface will be further preserved and the need for more costly roadway reconstruction will be delayed.
Projects — TIB Project Information
TIB Project Information
City of Mabton's 2026 Fog Seal
2-E-942(007)-1
2-E-942(007)-1
2026 Fog Seal
Multiple Locations
FY 2027 Small City Preservation Program
Current Phase : Bid Authorization
Total TIB Funding : $104,072
County: Yakima | Legislative District: 14 | Project Length: 0.00 | TIB Engineer: Jonathan Heusman | Last Payment Date:
Project Information
| Lead Agency | MABTON |
| Funding Year | 2027 |
| Program | SCPP |
| Current Phase | Bid Authorization |
| Legislative District | 14 |
| Congressional District | 4 |
| Federal Route Number | 9999 |
| Project Length | 0.00 mi. |
| ADT | 0 |
| Functional Class | TIB Arterial |
| Type of Work | Resurfacing |
| Project Contact | Mari Galvez |
| Contact Email | mari.galvez@co.yakima.wa.us |
| TIB Engineer | Jonathan Heusman |
| Last Payment Date | |
| Cultural Resource Assessment | Not Required |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 11/21/2025 | |
| Delayed Project Date | 01/01/2027 | |
| DAHP Assessment Date | ||
| Predesign Approval | ||
| Design Approval | 02/01/2026 | 02/06/2026 |
| Bid Auth. Approval | 04/01/2026 | 03/18/2026 |
| Construction Approval | 05/01/2026 | |
| Project Closeout | 08/01/2026 | |
| Audit Date | ||
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 0 | 0 |
| Right of Way | 0 | 0 |
| Total Design | 0 | 0 |
| Construction Engineering | 0 | 0 |
| Construction Contract | 104,072 | 109,550 |
| Other Construction | 0 | 0 |
| Total Construction | 104,072 | 109,550 |
| Total TIB Funding | 104,072 | 109,550 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| MABTON | 5,478 | 5.0% |
| WSDOT Funding | 0 | 0.0% |
| Total Local Funding | 5,478 | 5.0% |
Project Description
Fog seal over the existing 2024 otta seal.
Existing Condition
Project Benefits
- To seal up the loose chips from the otta seal and prolong and preserve the recent treatment so that it lasts longer.
Project Pictures
No images available.
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||