PCR scores of existing asphalt roadways within the project area range from 50 to 81. Approximately 1-mile of gravel roadways remain unpaved in the City.
Projects — TIB Project Information
TIB Project Information
City of Kittitas's 2026 Seal Coat
2-E-931(014)-1
2-E-931(014)-1
2026 Seal Coat
Multiple Locations
FY 2027 Small City Preservation Program
Current Phase : Bid Authorization
Total TIB Funding : $535,282
County: Kittitas | Legislative District: 13 | Project Length: 2.46 | TIB Engineer: Jonathan Heusman | Last Payment Date: 04/02/2026
Project Information
| Lead Agency | KITTITAS |
| Funding Year | 2027 |
| Program | SCPP |
| Current Phase | Bid Authorization |
| Legislative District | 13 |
| Congressional District | 8 |
| Federal Route Number | 9999 |
| Project Length | 2.46 mi. |
| ADT | 0 |
| Functional Class | TIB Arterial |
| Type of Work | Resurfacing |
| Project Contact | Ryan Baker |
| Contact Email | ryan.baker@cityofkittitas.com |
| TIB Engineer | Jonathan Heusman |
| Last Payment Date | 04/02/2026 |
| Cultural Resource Assessment | Not Required |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 11/21/2025 | |
| Delayed Project Date | 07/01/2028 | |
| DAHP Assessment Date | ||
| Predesign Approval | ||
| Design Approval | 02/01/2026 | 02/02/2026 |
| Bid Auth. Approval | 05/01/2026 | 04/29/2026 |
| Construction Approval | 06/01/2026 | |
| Project Closeout | 10/31/2026 | |
| Audit Date | ||
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 45,125 | 47,500 |
| Right of Way | 0 | 0 |
| Total Design | 45,125 | 47,500 |
| Construction Engineering | 53,010 | 55,800 |
| Construction Contract | 437,147 | 460,155 |
| Other Construction | 0 | 0 |
| Total Construction | 490,157 | 515,955 |
| Total TIB Funding | 535,282 | 563,455 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| KITTITAS | 28,173 | 5.0% |
| WSDOT Funding | 0 | 0.0% |
| Total Local Funding | 28,173 | 5.0% |
Project Description
City wide chip seal with some scattered gravel conversions to take care of the cities gravel streets.
Existing Condition
Project Benefits
Project Pictures
No images available.
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||