Washtucna average PCR is 71.5. However, many of the roads are gravel or nearly gravel.
Projects — TIB Project Information
TIB Project Information
Town of Washtucna's 2026 Crack Seal
2-E-846(005)-1
2-E-846(005)-1
2026 Crack Seal
Multiple Locations
FY 2027 Small City Preservation Program
Current Phase : Design
Total TIB Funding : $119,970
County: Adams | Legislative District: 9 | Project Length: 0.00 | TIB Engineer: Jonathan Heusman | Last Payment Date:
Project Information
| Lead Agency | WASHTUCNA |
| Funding Year | 2027 |
| Program | SCPP |
| Current Phase | Design |
| Legislative District | 9 |
| Congressional District | 5 |
| Federal Route Number | 9999 |
| Project Length | 0.00 mi. |
| ADT | 0 |
| Functional Class | TIB Arterial |
| Type of Work | |
| Project Contact | Tina Wells |
| Contact Email | clerkwashtucna@gmail.com |
| TIB Engineer | Jonathan Heusman |
| Last Payment Date | |
| Cultural Resource Assessment | Not Required |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 11/21/2025 | |
| Delayed Project Date | 01/01/2027 | |
| DAHP Assessment Date | ||
| Predesign Approval | ||
| Design Approval | 12/01/2025 | 04/01/2026 |
| Bid Auth. Approval | 03/30/2026 | |
| Construction Approval | 04/01/2026 | |
| Project Closeout | 09/30/2026 | |
| Audit Date | ||
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 0 | 0 |
| Right of Way | 0 | 0 |
| Total Design | 0 | 0 |
| Construction Engineering | 0 | 0 |
| Construction Contract | 119,970 | 119,970 |
| Other Construction | 0 | 0 |
| Total Construction | 119,970 | 119,970 |
| Total TIB Funding | 119,970 | 119,970 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| WASHTUCNA | 0 | 0.0% |
| WSDOT Funding | 0 | 0.0% |
| Total Local Funding | 0 | 0.0% |
Project Description
Townwide crack seal for maintenance.
Existing Condition
Project Benefits
- Preserve the existing streets from further deterioration and prepare for a future chip seal.
Project Pictures
No images available.
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||