|
Ross Canyon Road -
Riverside (SR 215) to Ironwood St The project reconstructs the road to provide two travel lanes with a continuous left turn lane. Pedestrian safety is greatly improved by adding sidewalk with curb and gutter on both sides. Drainage improvements provide adequate collection and conveyance of storm water. Realignment of the Riverside intersection prepares the site for future signalization. Project Benefits:
Funding for the $1,009,164 Ross Canyon Road project includes:
|