Points Maximum

Safety   45
Accident History & Potential    
  Correctable accident history 0 to 25  
  Implement State Policy goals 0 to 20  
Provides Access Management   5
  Add non-traversable median greater than 50% of project length 3  
  Add c-curb at intersections or less than 50% of project length 1  
  Reduce Access Points 2  
Eliminate Existing At-Grade Crossing   2
Points Maximum

Mobility   20
Level of Service   10
  Improvement from Existing Level of Service to Project Opening 0 to 10  
Truck Route (T-1 to T-3) 0 to 3  
Traffic Signal Interconnection 1  
Network Development   5
  Extends improvements 3  
  Completes a gap 5  
  New network connection 0 to 5  
  Peak hour Buses (1 pt for each 2 buses) 0 to 3  
Access Improvements    
  Improves Access to CBD or Activity Center 0 to 3  
  Improves Network or Circulation within CBD or Activity Center 0 to 2  
  Improves Access to Freight Facility 0 to 3  
Points Maximum

Pavement Condition   15
Visual Inspection of Existing Pavement   15
  Pavement Ratings less than 70 0 to 15  
New Route 10  
Rehabilitation Projects 7  
Sidewalk Condition 0 to 5  
Points Maximum

Sustainability   15
Modal Measures   15
  Completes gap in HOV system 3  
  Adds HOV Lane each direction 2  
  Adds Queue Jump or Transit Only Lane 1  
  Improves non-motorized access to Park & Ride or Transit center 1  
  Completes gap in Bicycle Route 3  
  Extends Bicycle Route 2  
  Construct 10-foot separated path or two 5-foot striped lanes 2  
  Install more that one bike parking facility along the project (multiple bike racks) 1  
  Sidewalk wider that TIB minimum (5 ft) 0 to 3  
  Planter Strip (3 foot minimum) 3  
Energy Measures   9
Replace or Install new LED street lights throughout the project 0 to 3  
Replace or Install new LED traffic signals throughout the project 0 to 2  
Install Solar Power Panels or on-site power generation technology to support facilities in the road right of way 1  
Emerging Technologies 0 to 3  
Environmental Measures   7
  Eliminate water detention through Low Impact Development (LID) / Natural Drainage Practices (NDP) (e.g. ecology embankment, permeable pavement) on-site to address 100% of all project impervious surfaces 3  
  Eliminate water detention through Low Impact Development (LID) / Natural Drainage Practices (NDP) (e.g. ecology embankment, permeable pavement) on-site to address 25% to 75% of all project impervious surfaces 0 to 3  
  Vegetated areas left undisturbed, or compost-amend soil with native plantings 1  
  Hardscaping or climate appropriate plantings 1  
  Emerging Technologies 0 to 3  
Recycling Measures   9
  On-site reuse of pavement 3  
  On-site reuse of subsurface material 1  
  On-site reuse of other materials 0 to 3  
  Use of recycled pavement (hauled in) 2  
  Use of recycled subsurface materials 1  
  use of recycled organic materials (hauled in) 1  
  Use of other recycled products 0 to 2  
Points Maximum

Local Support   5
Local Match (1 pt for each 5% above minimum) 0 to 4  
Previously Completed Work   3
  (Must be complete at time of application)    
  Environmental Permits Approved 1  
  Design Complete 1  
  Right of Way Acquisition Complete 1