|
|
||||
Region: East | Legislative District: 9 | Length: 0.00 mi. | FY 2025 Small City Preservation Program (SCPP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 9,500 | 500 | 10,000 |
Right of Way | 0 | 0 | 0 |
Construction | 144,829 | 7,623 | 152,452 |
Project Totals | $154,329 | $8,123 | $162,452 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
95.0% | 5.0% | 5% |
Mob, TC, Paint Line, Chip seal, Fog Seal, and Sweeping.