City of Gold Bar
9th Street Overlay
Multiple Locations
TIB Award Amount
$191,150
Region: Puget Sound   |   Legislative District: 12   |   Length: 0.00 mi. FY 2025 Small City Preservation Program (SCPP)

Existing Conditions

Anticipated Project Costs

  TIB Funds Local Funds Total Costs
Design 27,303 1,427 28,730
Right of Way 0 0 0
Construction 163,847 8,563 172,410
Project Totals $191,150 $9,990 $201,140

Local Match

TIB Participation Local Match Minimum Local Match
95.0% 5.0% 5%

Description of Improvements

Grind and 2-inch overlay with upgrade 2 ADA ramps for 9th Street - SR 2 to Linda Ave