Region: Puget Sound | Legislative District: 12 | Length: 0.00 mi. | FY 2025 Small City Preservation Program (SCPP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 27,303 | 1,427 | 28,730 |
Right of Way | 0 | 0 | 0 |
Construction | 163,847 | 8,563 | 172,410 |
Project Totals | $191,150 | $9,990 | $201,140 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
95.0% | 5.0% | 5% |
Grind and 2-inch overlay with upgrade 2 ADA ramps for 9th Street - SR 2 to Linda Ave