Region: East | Legislative District: 7 | Length: 0.00 mi. | FY 2025 Small City Maintenance Program (SCMP) |
Existing ConditionsThe City needs to replace thermoplastic crosswalk blocks. Existing thermoplastic is all but gone and weve been repainting yearly (for years) which is not cost effective. The crosswalk in the photo was repainted last fall. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 0 | 0 | 0 |
Right of Way | 0 | 0 | 0 |
Construction | 12,507 | 658 | 13,165 |
Project Totals | $12,507 | $658 | $13,165 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
95.0% | 5.0% | 5% |
We would like to purchase thermoplastic for all crosswalk blocks, along with a new torch.