|
|
||||
Region: East | Legislative District: 7 | Length: 0.00 mi. | FY 2025 Small City Maintenance Program (SCMP) |
Existing ConditionsCracking and alligatoring distresses throughout the nextwork. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 0 | 0 | 0 |
Right of Way | 0 | 0 | 0 |
Construction | 127,825 | 0 | 127,825 |
Project Totals | $127,825 | $0 | $127,825 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
100.0% | 0.0% | 0% |
Crack sealing and asphalt repair.