Town of Twisp
North End SR 20 PedestrianBike Path
Twisp River Br to Days Ln
TIB Award Amount
$611,372
Region: East   |   Legislative District: 7   |   Length: 2,059.00 ft. FY 2025 Urban Active Transportation Program (ATP)

Existing Conditions

A pedestrian and bicycle gap from the Twisp River Bridge to the northern city limit exists.

Project Funding

  TIB Funds Local Funds Total Costs
Design 0 0 0
Right of Way 0 0 0
Construction 611,372 1,053,590 1,664,962
Project Totals $611,372 $1,053,590 $1,664,962

Local Match

TIB Participation Local Match Minimum Local Match
36.7% 63.3% 5%

Description of Improvements

Extend a bike lane on the northbound side and a shared-use path on the southbound side of SR20. Intersection radii will be improved for crosswalks. Roadway will need realignment to accomodate proposed improvements.