|
|
||||
| Region: East | Legislative District: 7 | Length: 2,059.00 ft. | FY 2025 Urban Active Transportation Program (ATP) |
![]() |
Existing ConditionsA pedestrian and bicycle gap from the Twisp River Bridge to the northern city limit exists. |
| TIB Funds | Local Funds | Total Costs | |
|---|---|---|---|
| Design | 0 | 0 | 0 |
| Right of Way | 0 | 0 | 0 |
| Construction | 611,372 | 1,053,590 | 1,664,962 |
| Project Totals | $611,372 | $1,053,590 | $1,664,962 |
| TIB Participation | Local Match | Minimum Local Match |
|---|---|---|
| 36.7% | 63.3% | 5% |
Extend a bike lane on the northbound side and a shared-use path on the southbound side of SR20. Intersection radii will be improved for crosswalks. Roadway will need realignment to accomodate proposed improvements.