Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 09/13/2006 Payment 0.00 0.00 0.00 0.00 0.00 0.00 57,070.00 57,070.00
2 09/13/2006 Audit 0.00 0.00 0.00 0.00 0.00 0.00 3,773.97 3,773.97
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 60,843.97 60,843.97