Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 10/09/2023 Payment 0.00 0.00 0.00 0.00 112,040.03 0.00 0.00 112,040.03
2 10/31/2023 Payment 0.00 0.00 0.00 0.00 -112,040.03 0.00 312,148.10 200,108.07
3 12/04/2023 Payment 0.00 0.00 0.00 0.00 0.00 0.00 25,752.08 25,752.08
4 01/31/2024 Audit 0.00 0.00 4,793.70 0.00 9,849.50 0.00 -0.38 14,642.82
TOTAL PAYMENTS 0.00 0.00 4,793.70 0.00 9,849.50 0.00 337,899.80 352,543.00