Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 09/18/2023 Payment 0.00 0.00 0.00 0.00 0.00 0.00 103,309.02 103,309.02
2 10/17/2023 Payment 0.00 0.00 0.00 0.00 0.00 0.00 127,617.08 127,617.08
3 12/05/2023 Payment 0.00 0.00 0.00 0.00 0.00 0.00 20,337.95 20,337.95
4 01/31/2024 Audit 0.00 0.00 4,031.00 0.00 7,705.00 0.00 -0.05 11,735.95
TOTAL PAYMENTS 0.00 0.00 4,031.00 0.00 7,705.00 0.00 251,264.00 263,000.00