Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 04/11/2014 Payment 0.00 0.00 22,747.73 0.00 0.00 0.00 0.00 22,747.73
2 08/05/2014 Payment 0.00 0.00 -0.03 0.00 8,448.33 0.00 176,510.32 184,958.62
3 08/27/2014 Audit 0.00 0.00 5,988.73 0.00 626.98 0.00 -0.06 6,615.65
TOTAL PAYMENTS 0.00 0.00 28,736.43 0.00 9,075.31 0.00 176,510.26 214,322.00