Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 11/09/2011 Payment 0.00 0.00 0.00 0.00 7,376.67 0.00 46,346.78 53,723.45
2 03/30/2012 Audit 0.00 0.00 0.00 0.00 -1,645.32 0.00 4,472.87 2,827.55
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 5,731.35 0.00 50,819.65 56,551.00