Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 07/25/2008 Payment 0.00 0.00 0.00 0.00 0.00 0.00 19,250.39 19,250.39
2 08/28/2008 Payment 0.00 0.00 0.00 0.00 0.00 0.00 7,050.47 7,050.47
3 12/02/2008 Payment 0.00 0.00 0.00 0.00 0.00 0.00 870.42 870.42
4 08/12/2009 Payment 0.00 0.00 0.00 0.00 0.00 0.00 18,018.57 18,018.57
5 09/09/2009 Audit 0.00 0.00 0.00 0.00 0.00 0.00 5,497.76 5,497.76
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 50,687.61 50,687.61