Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 08/31/2020 Audit 0.00 0.00 1,770.52 0.00 0.00 0.00 105,989.48 107,760.00
TOTAL PAYMENTS 0.00 0.00 1,770.52 0.00 0.00 0.00 105,989.48 107,760.00