Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 08/30/2017 Audit 0.00 0.00 0.00 0.00 0.00 0.00 16,084.00 16,084.00
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 16,084.00 16,084.00