Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 12/12/2018 Payment 0.00 0.00 0.00 0.00 0.00 0.00 1,628.75 1,628.75
2 02/18/2020 Audit 0.00 0.00 0.00 0.00 3,715.00 0.00 20,995.25 24,710.25
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 3,715.00 0.00 22,624.00 26,339.00