Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 01/08/2009 Payment 0.00 0.00 4,334.59 0.00 0.00 0.00 0.00 4,334.59
2 07/20/2009 Payment 0.00 0.00 0.00 0.00 0.00 0.00 95,989.85 95,989.85
3 12/01/2009 Audit 0.00 0.00 3,236.79 0.00 5,549.90 0.00 -3,506.46 5,280.23
TOTAL PAYMENTS 0.00 0.00 7,571.38 0.00 5,549.90 0.00 92,483.39 105,604.67