Current Phase : Audit
Total TIB Funding : $107,760

County: Grays Harbor   |   Legislative District: 19   |   Project Length: 0.14   |   TIB Engineer: Chris Langhoff   |   Last Payment Date: 08/31/2020

Project Information

Lead Agency MONTESANO
Funding Year 2021
Program SCPP
Current Phase Audit
Legislative District 19
Congressional District 6
Federal Route Number 9999
Project Length 0.14 mi.
ADT 0
Functional Class TIB Arterial
Type of Work Resurfacing
Project Contact Mike Olden
Contact Email molden@montesano.us
TIB Engineer Chris Langhoff
Last Payment Date 08/31/2020

Project Schedule

  Target Date Actual Date
Project Selection Date   11/22/2019
Delayed Project Date 07/01/2022  
Predesign Approval
Design Approval 02/01/2020 12/16/2019
Bid Auth. Approval 05/01/2020 04/27/2020
Construction Approval 06/01/2020 05/20/2020
Project Closeout 10/31/2020 08/12/2020
Audit Date   08/31/2020
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 1,983
Right of Way 0 0
Total Design 0 1,983
     
Construction Engineering 1,786 0
Construction Contract 123,214 118,709
Other Construction 0 0
Total Construction 125,000 118,709
     
Funding Surplus - 17,240  
Total TIB Funding 107,760 120,692

Local Funding Partners

Funding Amount Percent
MONTESANO 12,932 10.7%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 12,932 10.7%

Project Description

Plane 1' existing asphalt to top of existing concrete road section in this heavily utilized east/west corridor. Prelevel and install 2' HMA overlay. City crew to repair deficient sidewalk and curbs on the south side. Curb height is high on both sides and will allow for 2' overlay. City crews will also replace non-compliant curb ramps and install storm drains at the Chehalis Street intersection before the overlay work commences.