Current Phase : Audit
Total TIB Funding : $107,760
County: Grays Harbor | Legislative District: 19 | Project Length: 0.14 | TIB Engineer: Chris Langhoff | Last Payment Date: 08/31/2020
Project Information
Lead Agency | MONTESANO |
Funding Year | 2021 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 19 |
Congressional District | 6 |
Federal Route Number | 9999 |
Project Length | 0.14 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Resurfacing |
Project Contact | Mike Olden |
Contact Email | molden@montesano.us |
TIB Engineer | Chris Langhoff |
Last Payment Date | 08/31/2020 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/22/2019 | |
Delayed Project Date | 07/01/2022 | |
Predesign Approval | ||
Design Approval | 02/01/2020 | 12/16/2019 |
Bid Auth. Approval | 05/01/2020 | 04/27/2020 |
Construction Approval | 06/01/2020 | 05/20/2020 |
Project Closeout | 10/31/2020 | 08/12/2020 |
Audit Date | 08/31/2020 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 1,983 |
Right of Way | 0 | 0 |
Total Design | 0 | 1,983 |
Construction Engineering | 1,786 | 0 |
Construction Contract | 123,214 | 118,709 |
Other Construction | 0 | 0 |
Total Construction | 125,000 | 118,709 |
Funding Surplus | - 17,240 | |
Total TIB Funding | 107,760 | 120,692 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
MONTESANO | 12,932 | 10.7% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 12,932 | 10.7% |
Project Description
Plane 1' existing asphalt to top of existing concrete road section in this heavily utilized east/west corridor. Prelevel and install 2' HMA overlay. City crew to repair deficient sidewalk and curbs on the south side. Curb height is high on both sides and will allow for 2' overlay. City crews will also replace non-compliant curb ramps and install storm drains at the Chehalis Street intersection before the overlay work commences.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |