City of Kennewick
Columbia Center Boulevard
Deschutes Ave Intersection
TIB Award Amount
$1,280,000
Region: Southeast   |   Legislative District: 8   |   Length: 0.20 mi. FY 2023 Urban Arterial Program (UAP)

Existing Conditions

Columbia Center Blvd. has the highest traffic volumes in the City of Kennewick. This corridor serves the existing Columbia Center Mall, Costco, Toyota Center and Three Rivers Convention Center. Expected traffic volumes are projected to increase on this corridor. Current configuration operates with east leg having a single left turn lane, and one shared through/ right-turn lane. West leg has a single left turn lane, one through-lane, and a single right-turn lane. South leg consists of three through-lanes SB, two NB through-lanes, a single left-turn and a single right-turn lane. North leg consists of two through-lanes both NB and SB, and one left-turn lane. The Columbia and Deshutes intersection has the 8th highest crash location, and is a projected 2040 bottleneck.

Project Funding

  TIB Funds Local Funds Total Costs
Design 0 0 0
Right of Way 0 0 0
Construction 1,280,000 320,000 1,600,000
Project Totals $1,280,000 $320,000 $1,600,000

Local Match

TIB Participation Local Match Minimum Local Match
80.0% 20.0% 20%

Description of Improvements

A right-turn lane for west to north-bound traffic at Columbia and Deshutes intersection. A roundabout is proposed for the Deschutes and Colorado intersection.