City of Battle Ground
SE Grace Avenue - Phase II
NE 1st St to SE Rasmussen Blvd
TIB Award Amount
$3,000,000
Region: Southwest   |   Legislative District: 18   |   Length: 0.50 mi. FY 2023 Urban Arterial Program (UAP)

Existing Conditions

SE Grace Avenue is the main north/south corridor serving Battle Ground's industrial core. It connects with NE Grace Avenue via an offset intersection with E Main Street, causing significant delays, safety concerns including accidents, and has proven to hinder private investment in and around Battle Ground. This corridor provides a connection between Battle Ground Village and Old Town and the Community Center. The lack of sidewalks and bike lanes make for a dangerous connection between these areas. The existing road directly abuts an unsignalized railroad crossing.

Project Funding

  TIB Funds Local Funds Total Costs
Design 0 331,500 331,500
Right of Way 500,000 1,044,500 1,544,500
Construction 2,500,000 1,934,056 4,434,056
Project Totals $3,000,000 $3,310,056 $6,310,056

Local Match

TIB Participation Local Match Minimum Local Match
47.5% 52.5% 15%

Description of Improvements

The solution to the problem described above is to expand this corridor to the standard 3-lane section for a minor arterial including bike lanes and sidewalks. Additionally, realigning this leg so that it connects directly to NE Grace Avenue at E Main Street and signalizing the new intersection.