City of Spokane
Haven Street Sidewalk
Rockwell Ave to Heroy Ave
TIB Award Amount
$207,371
Region: East   |   Legislative District: 3   |   Length: 950.00 ft. FY 2023 Sidewalk Program (SP)

Existing Conditions

Haven St. is an existing Principal Arterial and high traffic corridor and Spokane Transit bus route uses this street. The corridor includes numerous nearby commercial/business destinations as well as a large Spokane School District education campus approximately one block from Haven St. that includes Shaw Middle School, Newtech Skill Center, Regal Elementary School and School District offices and operations facilities. Additionally, the Spokane-Hillyard Library and Northeast Community Center is located just west of the education campus.There are no existing sidewalks along the westerly side of Haven St. for the three block stretch from Heroy Ave. to Rockwell Ave. creating a deficient condition for pedestrian access to transit stops, schools and businesses.

Project Funding

  TIB Funds Local Funds Total Costs
Design 19,594 8,398 27,992
Right of Way 0 0 0
Construction 187,776 80,476 268,252
Project Totals $207,371 $88,873 $296,244

Local Match

TIB Participation Local Match Minimum Local Match
70.0% 30.0% 20%

Description of Improvements

Install infill separated sidewalk and requisite ADA ramps along the westerly side of Haven St. where no sidewalk exists today.