Region: Puget Sound | Legislative District: 33 | Length: 850.00 ft. | FY 2023 Sidewalk Program (SP) |
Existing ConditionsThere is a gap in the sidewalk system between S 174th Street and SW 176th Street. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 35,280 | 8,820 | 44,100 |
Right of Way | 0 | 0 | 0 |
Construction | 270,560 | 67,640 | 338,200 |
Project Totals | $305,840 | $76,460 | $382,300 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
80.0% | 20.0% | 15% |
This project constructs a sidewalk and other pedestrian improvements along this 1st Ave S between S 174th St and SW 176th St closing the gap in the sidewalk system.