City of Normandy Park
1st Avenue Sidewalk
S 174th St to SW 176th St
TIB Award Amount
$305,840
Region: Puget Sound   |   Legislative District: 33   |   Length: 850.00 ft. FY 2023 Sidewalk Program (SP)

Existing Conditions

There is a gap in the sidewalk system between S 174th Street and SW 176th Street.

Project Funding

  TIB Funds Local Funds Total Costs
Design 35,280 8,820 44,100
Right of Way 0 0 0
Construction 270,560 67,640 338,200
Project Totals $305,840 $76,460 $382,300

Local Match

TIB Participation Local Match Minimum Local Match
80.0% 20.0% 15%

Description of Improvements

This project constructs a sidewalk and other pedestrian improvements along this 1st Ave S between S 174th St and SW 176th St closing the gap in the sidewalk system.