City of Selah
W Goodlander Road
Terry Ln to N 1st St
TIB Award Amount
$186,372
Region: East   |   Legislative District: 15   |   Length: 470.00 ft. FY 2021 Sidewalk Program (SP)

Existing Conditions

The City of Selah residential development continues to fill in near W Goodlander Road. Sidewalk on Goodlander Road has been constructed as adjacent properties have been developed, however there are still gaps in the sidewalk that need to be constructed. The Citys Complete Streets Policy promotes consideration of completing sidewalk gaps and non-conforming ADA ramps during transportation projects. This Major Collector reaches many established and developing properties with a non-motorized transportation system that is discontinuous and not able to provide healthy options for people of all ages and abilities.

Project Funding

  TIB Funds Local Funds Total Costs
Design 21,501 2,389 23,890
Right of Way 0 0 0
Construction 164,871 18,319 183,190
Project Totals $186,372 $20,708 $207,080

Local Match

TIB Participation Local Match Minimum Local Match
90.0% 10.0% 10%

Description of Improvements

Complete the missing gaps of sidewalk and remove and replace the non-conforming ADA ramps on Goodlander between N 1st Street and Terry Lane.