City of Zillah
Downtown Sidewalk
6th St to 8th St First Ave to Second Ave
TIB Award Amount
$248,337
Region: East   |   Legislative District: 15   |   Length: 825.00 ft. FY 2023 Small City Sidewalk Program (SCSP)

Existing Conditions

Due to previous years of bad weather, the city has seen a freeze thaw process that has caused many issues with the sidewalks especially around the downtown core area. Due to the lifting and separation of the sidewalk, it has created many tripping/fall hazards that have been compounded during winter weather. There are many areas that have crumbling and spalling concrete that needs to be addressed as well.

Project Funding

  TIB Funds Local Funds Total Costs
Design 28,656 3,184 31,840
Right of Way 0 0 0
Construction 219,681 24,409 244,090
Project Totals $248,337 $27,593 $275,930

Local Match

TIB Participation Local Match Minimum Local Match
90.0% 10.0% 5%

Description of Improvements

This project will repair and replace segment of sidewalk.