Town of Coupeville
NW 6th Street Trail
NW Krueger to NW Wilkes
TIB Award Amount
$50,245
Region: West   |   Legislative District: 10   |   Length: 1,570.00 ft. FY 2023 Small City Sidewalk Program (SCSP)

Existing Conditions

This section of trail is highly used be citizens wanting to access the Farmers Market, Post Office, Library, bus stops and the Downtown Commercial business center. The current gravel trail is difficult to maintain and those with strollers or who have difficulty walking end up in the street in order to have a safe, smooth, solid surface.

Project Funding

  TIB Funds Local Funds Total Costs
Design 0 0 0
Right of Way 0 0 0
Construction 50,245 2,644 52,889
Project Totals $50,245 $2,644 $52,889

Local Match

TIB Participation Local Match Minimum Local Match
95.0% 5.0% 5%

Description of Improvements

Resurfacing the existing gravel trail with asphalt will create a smooth and accessible pedestrian access for those that walk to Town regularly as well as lower the maintenance requirements.