Region: West | Legislative District: 10 | Length: 1,570.00 ft. | FY 2023 Small City Sidewalk Program (SCSP) |
Existing ConditionsThis section of trail is highly used be citizens wanting to access the Farmers Market, Post Office, Library, bus stops and the Downtown Commercial business center. The current gravel trail is difficult to maintain and those with strollers or who have difficulty walking end up in the street in order to have a safe, smooth, solid surface. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 0 | 0 | 0 |
Right of Way | 0 | 0 | 0 |
Construction | 50,245 | 2,644 | 52,889 |
Project Totals | $50,245 | $2,644 | $52,889 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
95.0% | 5.0% | 5% |
Resurfacing the existing gravel trail with asphalt will create a smooth and accessible pedestrian access for those that walk to Town regularly as well as lower the maintenance requirements.