City of Elma
Young Street
1st St to 4th St
TIB Award Amount
$260,010
Region: West   |   Legislative District: 24   |   Length: 900.00 ft. FY 2021 Small City Sidewalk Program (SCSP)

Existing Conditions

There is a need to replace the sidewalk in this corridor to address ADA access, correct sidewalk tripping hazards. This corridor provides pedestrian access to many Public Facilities; Post Office, Police Fire Depts., Library, Senior Center, and Food Bank.

Project Funding

  TIB Funds Local Funds Total Costs
Design 29,970 3,330 33,300
Right of Way 0 0 0
Construction 230,040 25,560 255,600
Project Totals $260,010 $28,890 $288,900

Local Match

TIB Participation Local Match Minimum Local Match
90.0% 10.0% 5%

Description of Improvements

Update/replace pedestrian facilities on Young St.