Region: West | Legislative District: 24 | Length: 900.00 ft. | FY 2021 Small City Sidewalk Program (SCSP) |
Existing ConditionsThere is a need to replace the sidewalk in this corridor to address ADA access, correct sidewalk tripping hazards. This corridor provides pedestrian access to many Public Facilities; Post Office, Police Fire Depts., Library, Senior Center, and Food Bank. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 29,970 | 3,330 | 33,300 |
Right of Way | 0 | 0 | 0 |
Construction | 230,040 | 25,560 | 255,600 |
Project Totals | $260,010 | $28,890 | $288,900 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
90.0% | 10.0% | 5% |
Update/replace pedestrian facilities on Young St.