City of Forks
Spartan Ave, A St and Blackberry Ave
Division St to Division St
TIB Award Amount
$335,253
Region: West   |   Legislative District: 24   |   Length: 914.00 ft. FY 2021 Small City Sidewalk Program (SCSP)

Existing Conditions

The project will improve the connectivity of pedestrian traffic from residential and commercial areas to the Junior High School and High School located on the south side of A Street SE. It will also improve access to the United States Post Office located on the northeast corner of A Street SE and Spartan Ave and the veterans services located on the southside of A Street SE. The project will complete the pedestrian facilities along the north side of A street SE and S. Blackberry Ave (westside of road). Pedestrian ramps will be brought up to current ADA standards.

Project Funding

  TIB Funds Local Funds Total Costs
Design 38,683 2,036 40,719
Right of Way 0 0 0
Construction 296,570 15,609 312,179
Project Totals $335,253 $17,645 $352,898

Local Match

TIB Participation Local Match Minimum Local Match
95.0% 5.0% 5%

Description of Improvements

This project proposes to construct approximately 914 feet of sidewalk, ADA ramps, curb gutter and HMA repairs along new curb line for the following streets: Spartan Avenue between E. Division Street. A Street SE between Spartan Ave and S. Blackberry Ave. S. Blackberry Ave. between A Street SE and E. Division Street.