Region: West | Legislative District: 19 | Length: 760.00 ft. | FY 2021 Small City Sidewalk Program (SCSP) |
Existing ConditionsThis project will provide a vital link between multi family housing, residential, public recreation, commercial and other properties to access the sidewalks that connect to the City center and the high school and multi-family/low income areas. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 930 | 70 | 1,000 |
Right of Way | 0 | 0 | 0 |
Construction | 161,070 | 12,130 | 173,200 |
Project Totals | $162,000 | $12,200 | $174,200 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
93.0% | 7.0% | 5% |
Build a new sidewalk to fill a gap in the sidewalk system between Academy and Glenn Street.