|
|
||||
Region: West | Legislative District: 19 | Length: 0.00 mi. | FY 2024 Small City Preservation Program (SCPP) |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 35,625 | 1,875 | 37,500 |
Right of Way | 0 | 0 | 0 |
Construction | 389,642 | 20,508 | 410,150 |
Project Totals | $425,267 | $22,383 | $447,650 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
95.0% | 5.0% | 5% |
2 inch overlay of the following segments: Gerber Avenue - SR 6 to Elwood St Elwood Street - Gerber Ave to Harvard St Harvard Street - Elwood St to SR 6