| Region: East | Legislative District: 14 | Length: 0.00 mi. | FY 2024 Small City Preservation Program (SCPP) |
![]() |
Existing Conditions |
| TIB Funds | Local Funds | Total Costs | |
|---|---|---|---|
| Design | 9,500 | 500 | 10,000 |
| Right of Way | 0 | 0 | 0 |
| Construction | 162,916 | 8,574 | 171,490 |
| Project Totals | $172,416 | $9,074 | $181,490 |
| TIB Participation | Local Match | Minimum Local Match |
|---|---|---|
| 95.0% | 5.0% | 5% |
2 inch overlay of the following segemnt Willow Street - Stuben St to back of concrete driveway Willow Street - W Franklin St to W Jefferson St