City of George
2022 Overlay Award
Washington Wy to E Deacon St
TIB Award Amount
$486,700
Region: East   |   Legislative District: 13   |   Length: 0.00 mi. FY 2024 Small City Preservation Program (SCPP)

Existing Conditions

Anticipated Project Costs

  TIB Funds Local Funds Total Costs
Design 56,100 0 56,100
Right of Way 0 0 0
Construction 430,600 0 430,600
Project Totals $486,700 $0 $486,700

Local Match

TIB Participation Local Match Minimum Local Match
100.0% 0.0% 0%

Description of Improvements

Grind and overlay the existing roadway. Complete subgrade repair (digouts) and crack sealing where needed. E Montmorency Blvd - Washington Wy to E Deacon St