Region: Puget Sound | Legislative District: 48 | Length: 0.00 mi. | FY 2024 Small City Preservation Program (SCPP) |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 12,600 | 1,400 | 14,000 |
Right of Way | 0 | 0 | 0 |
Construction | 219,060 | 24,340 | 243,400 |
Project Totals | $231,660 | $25,740 | $257,400 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
90.0% | 10.0% | 10% |
Grinds and provides a 2-inch overlay of Upland Road from Overlake Drive W to NE 6th St