|
|
||||
Region: East | Legislative District: 13 | Length: 0.00 mi. | FY 2023 Small City Preservation Program (SCPP) |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 0 | 0 | 0 |
Right of Way | 0 | 0 | 0 |
Construction | 92,625 | 4,875 | 97,500 |
Project Totals | $92,625 | $4,875 | $97,500 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
95.0% | 5.0% | 5% |
Chip seal and crack seal the following segments: 2nd Street - Lewis St to 150ft w/o Benton St Rainier Drive - Lewis Lane to 250ft s/o Barbara Lane