Region: West | Legislative District: 18 | Length: 0.00 mi. | FY 2023 Small City Preservation Program (SCPP) |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 0 | 0 | 0 |
Right of Way | 0 | 0 | 0 |
Construction | 169,854 | 67,303 | 237,157 |
Project Totals | $169,854 | $67,303 | $237,157 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
71.6% | 28.4% | 5% |
2150 LF of 12-wide travel lane will be paved at a 2 inch depth. 200 LF of subgrade is failing and 2 inch of base and geogrid will be replaced. Reconstruct 200 lineal feet of pavement and base and stabilize subgrade with base and geogrid and paved.