City of La Center
2021 Overlay
One Location
TIB Award Amount
$169,854
Region: West   |   Legislative District: 18   |   Length: 0.00 mi. FY 2023 Small City Preservation Program (SCPP)

Existing Conditions

Anticipated Project Costs

  TIB Funds Local Funds Total Costs
Design 0 0 0
Right of Way 0 0 0
Construction 169,854 67,303 237,157
Project Totals $169,854 $67,303 $237,157

Local Match

TIB Participation Local Match Minimum Local Match
71.6% 28.4% 5%

Description of Improvements

2150 LF of 12-wide travel lane will be paved at a 2 inch depth. 200 LF of subgrade is failing and 2 inch of base and geogrid will be replaced. Reconstruct 200 lineal feet of pavement and base and stabilize subgrade with base and geogrid and paved.